Installation Guide for Gutter and Downpipe System

Planning and Components
  • Utilize component diagrams to determine the type and quantity of products required for your installation.
Fascia Bracket Spacing:
  • Straight Gutter Runs: Maximum spacing of 1 metre.
  • Niagara System: Maximum spacing of 800mm.
  • Xtraflo System: Maximum spacing of 600mm.
  • 80mm Round Downpipe with Hi-Cap and Niagara Systems: Maximum spacing of 800mm.
  • High Snowfall Areas: Maximum spacing of 400mm.
Fitting Support:
  • Place fascia brackets within 150mm of angles and stopends.
  • Use a supporting pipe clip on shoes, branches, and bends where necessary.
  • Support downpipes below offsets, with maximum spacing of 1.8 metres.
Removing Old Components
  • Remove the old gutter and replace any old fascia board with Swish low maintenance PVC-UE co-extruded fascia board.
Installing Running Outlet
  • Determine the position of the running outlet, typically over an existing drain, and secure it to the fascia board.
Fixing Fascia Brackets
  • Install a fascia bracket 100mm from the furthest point of the outlet.
  • Ensure a fall towards the outlet (1:350 recommended) using a string line.
Fixing Procedures
  • Fascia and Union Brackets: Position to avoid splitting the top edge of the timber fascia board. Use two 25mm x 5mm (1” x 10) screws or one 40mm x 5mm (1½“ x 10) screw for all brackets. "Cast Iron" fascia brackets must be secured with two fixings.
  • Unions: Fixed using a 25mm x 5mm (1” x 10) screw.
  • Outlets and Angles: Fixed using two 25mm x 5mm (1” x 10) screws.
  • Heavy Snowfall Areas: Each fascia bracket should be secured with two 25mm x 5mm (1” x 10) screws.
  • Rainwater Downpipe Clips: Use two 40mm x 6mm (1½“ x 12) screws.
  • Screw Types: Round head screws are preferred; counter sunk screws can be used with caution to prevent overtightening.
Lubrication
  • Lubricate all gutter seals with FloPlast silicone spray lubricant for easy fitting and to accommodate expansion and contraction.
Gutter Assembly
  • Starting from the running outlet, insert the back edge of the gutter under the retaining lip of the wrap-around clip.
  • Apply slight downward pressure to snap the front edge of the clip over the front of the gutter, ensuring to maintain the marked expansion allowance.
Joining Gutter Lengths
  • Use a union bracket or angle to connect the next gutter length, finishing the run with a stopend.
Downpipe Installation
  • Start the downpipe installation at the outlet.
  • For offsets, use two offset bends (with or without a short pipe) or an adjustable offset bend.
  • Ensure a 6mm gap at the top of the downpipe for expansion.
  • Secure pipe connectors to the wall with a pipe clip.
  • Fit a shoe at the base of the pipe secured with a pipe clip or connect the downpipe to an underground drainage system using a 110mm x 68mm reducer (SP96/D96 or D97).
Additional Notes 
  • Refer to the snow loading statement on page 26 for detailed guidelines regarding snow load considerations.
  • Always ensure all fixings are secure and follow local building regulations and standards during installation.


Your Basket is Empty

Your trusted partner for uPVC building products

Need to see it before you buy? We offer samples of our uPVC building products to help you choose the perfect fit. Simply get in touch through our contact page, and we’ll be happy to assist!

cookie

We use cookies on this site to enhance your user experience. For a complete overview of all cookies used, please see our Privacy Policy