0117 311 3700
Prices Incl. VAT
Yes No
500mm White Double Ended Internal Fascia Corner Image
magnifying glass image

500mm White Double Ended Internal Fascia Corner

SKU: C298W

Brand: Swish Building Products

  • Perfect 90° Fit: Designed for neat, professional joins on internal fascia corners.

  • Durable uPVC Construction: Injection-moulded for strength, longevity, and a seamless finish.

  • Fade-Resistant Quality: Guaranteed not to discolour, maintaining a clean appearance over time.

  • Certified Standards: BSI Kitemarked and manufactured under ISO9001 for proven reliability.

  • Long-Term Guarantee: Backed by a 20-year extended product warranty for complete peace of mind.

Description

500mm White Double-Ended Internal Fascia Corner

Seamless Finish for 90° Internal Roofline Connections

The 500mm White Double-Ended Internal Fascia Corner is designed to create a neat, professional finish at 90° internal roofline bends. Manufactured from durable injection-moulded uPVC, this corner piece provides a seamless connection between fascia boards, improving both the appearance and durability of your installation.

Ideal for both contractors and DIY projects, the internal fascia corner is easy to install and guarantees long-lasting performance. Unlike timber alternatives, it will not crack, warp, rot, or require painting—making it a low-maintenance solution for modern roofline projects.

Certified for quality and backed by a 20-year guarantee, this corner trim ensures your installation stands the test of time.


✅ Key Features & Benefits

  • Seamless Finish – Provides a clean, professional connection at 90° internal corners.

  • Durable uPVC – Weather-resistant, rot-proof, and maintenance-free.

  • Double-Ended Design – Supplied in 500mm for flexible fitting options.

  • Easy to Install – Quick, hassle-free installation for contractors or DIYers.

  • Long-Lasting Quality – Guaranteed not to discolour, ensuring a lasting finish.

  • Certified Performance – BSI Kitemarked and manufactured under ISO9001 standards.

  • Peace of Mind – Backed by a 20-year extended product guarantee.

📏 Specifications

  • Product Type: Internal Fascia Corner Trim

  • Angle: 90° internal

  • Length: 500mm (double-ended)

  • Colour: White

  • Material: Injection-moulded uPVC

  • Certification: BSI Kitemarked, ISO9001

  • Guarantee: 20 years

✨ Complete your roofline with confidence. The 500mm White Double-Ended Internal Fascia Corner delivers strength, durability, and a seamless professional finish to every project.

Technical Information

  • Delivery: 1-2 Working Days
  • Weight: 0.08 Kg
  • Brand Name: Swish Building Products
  • Colour: White
  • Material: PVC-u
  • Guarantee: 20 Years Manufacturers
  • Lead Time: In Stock

Delivery & Returns

Delivery
The despatch timings we publish are estimates and due consideration needs to be made when making purchases with tight deadlines and as such we shall not be liable for any losses, costs, damages, charges, or expenses caused by any delay for delivery of the goods.
Returns Policy For Brissco Online
We appreciate that there may be occasions you may wish to return items. To help you with this process please see our returns policy below.
Returning an item – Damaged
In the event you receive damaged goods we will arrange a replacement item for you. However, it is your responsibility to notify us within 72 hours of receipt that an item has been received damaged (please see risk below).
Returning an item – Risk
On receipt of the delivery you, the customer, are responsible for those goods and any loss or damage to the goods shall be at your own risk.
Returning an item – Incorrect
If you receive incorrect goods it is your responsibility to notify us within 72 hours of receipt at which point we will make the necessary arrangements.
Delivery shortages
Firstly, our carrier delivers parcels/packages. Any shortages of them must be reported to the driver on receipt. Secondly, shortages of contents of the parcel(s)/package(s) against the enclosed Brissco advice note must be made within 72 hours.

PDFs

FAQs

1. What is the safest way to access a work area when installing fascia boards or cladding?

Always use a full scaffold platform or a purpose-made cantilevered deck system with guard rails. Never attempt to work from an unsupported ladder or unstable surface.

2. How should boards be stored and handled?

Boards should be loaded and unloaded by hand, with both ends of a 5m length supported. They should be stacked no higher than 1m, in their packing sleeve, on a flat base, and kept away from solvents, paint, creosote, and bitumen.

3. What tools are recommended for cutting or shaping?

Conventional carpentry tools, including fine-toothed saws, can be used. Power tools may also be used at speeds suitable for timber. Pre-drilling is not necessary for nail or screw holes.

4. Can fascia boards support roof tiles?

Yes, Summit Sumo 20mm and 16mm boards, including foiled boards, can support the weight of the lower row of tiles without requiring a tilt fillet or kick plate.

5. What type of fixings should be used?

A4 grade stainless steel plastic-headed nails or capped screws should be used to ensure durability and resistance to corrosion.

6. What are the fixing guidelines for cover boards and cladding?

  • 9mm Cover Boards: Nails (50mm) or screws (40mm), max centres 600mm (white) or 400mm (foiled/coloured).

  • 20mm and 16mm Boards: Nails (65mm) or Nails (50mm), max centres 600mm (white) or 400mm (foiled/coloured).

  • Flat Boards: Nails (40mm) or screws (40mm).

  • Cladding: Nails (30mm), max centres 400mm. Ensure plank ends are always nailed.

7. What expansion gaps are required during installation?

A minimum 4mm gap must be left at the end of each board. Where two boards meet, leave an overall 8mm expansion gap.

8. Which sealants should be used?

A low modulus silicone (BS 5889 Type A) should be used. A primer is required when bonding to GRP, stainless steel, aluminium, or untreated wood. Sealants should not be used with polycarbonate sheets.

9. How should asbestos be dealt with if encountered?

By law, asbestos materials must be removed only by trained operatives under controlled conditions. If asbestos is suspected, contact your Local Authority.

10. Why is ventilation important in roof voids and cladding installations?

Ventilation prevents condensation of warm air on cold surfaces, which can lead to rot and mould. For foiled cladding, a free air path must be provided between vertical battens, with ventilation continuity achieved by venting into the eaves or leaving a 10mm gap between the cladding and soffit.

£ 4.56 EXC VAT

£ 5.47 INC VAT

in stock Lead Time: In Stock

delivery Est Delivery: 1-2 Working Days

Your Basket is Empty

Your trusted partner for uPVC building products

Need to see it before you buy? We offer samples of our uPVC building products to help you choose the perfect fit. Simply get in touch through our contact page, and we’ll be happy to assist!

cookie

We use cookies on this site to enhance your user experience. For a complete overview of all cookies used, please see our Privacy Policy